Full Basement Remodel Project

This basement was 1100s/f. The plan we came up with was for a bedroom, bathroom/shower room and a play area that could have been a small gym. The main features were a movie lounge room and pool table / entertainment are with wet bar.  Extra features included built in book shelving and a toy closet, double bedroom closet and built in entertainment shelves as well as a designer archway and acid stained floor in the pool are and bathroom. We also enclosed the furnace and sound proofed the entire ceiling. The full project took 6 weeks with 2 people and was fully permitted and inspected at each completed stage. (I don’t waste time.)

*Click each picture to enlarge.

 

Preparing the basement.

Framing Stage.

Plumbing, Electrical, Insulation and Drywall.

Cleanup & Acid Floor Prep before Texture.

Texture finished / Then Acid Stain & Bathroom Prep for Seal & Fittings.

Bar Design / Acid Seal before Full Basement Painting.

. The Final Finished Basement .

  ren · o · vate  - Verb:   To repair, improve, transform, modernize, remodel.

About | Gallery | Services | Free Consultation

 

White Knight Renovations LLC
Erie, CO
info [at] whiteknightrenovations [dotcom]
Serving Denver, Northern Colorado & Surrounding Areas

General Contractor, Handyman & Home Improvement services for Erie, Broomfield, Superior, Westminster, Lafayette, Louisville, Boulder, Denver & Surrounding areas. Weld County & Boulder County.